Net Zero Timeline

First Tesla Received

GCHQ Switch to green energy

EV Charging business established
Other offices switch to green energy
GC first achieved carbon neutrality
Formally committed to setting Science Based Targets and becoming Net Zero

Achieve BCorp Status

Waste broker in place Go Green

First full carbon footprint completed of our Scope 1,2 & 3 activities
First fully electric van received
Near Term and Net Zero Targets submitted to the SBTi

Carbon leads and planning
- Carbon Leads appointed across the business
- Net Zero Carbon Plan in place
- New Decarbonisation division set up
Formally committed to setting Science Based Targets and becoming Net Zero
- New FT contracts in place mandating Net Zero requirements
- Green travel plan in place for each office
- Carbon training programme in place to reach all levels in the business
All DE hand tools non-fossil fuelled (where tech is available)
Zero waste to landfill plans in place with waste brokers
All GC Passenger Fleet fully electric
- All DE equipment non fossil fuelled (where tech is available)
- Low carbon product list in place with top suppliers
- All remaining DE plant, equipment and vehicles non fossil fuelled
- 100% waste recycled / reused
Near Term Targets Achieved
Ground Control Ltd commits to reduce absolute Scope 1 & 2 GHG emissions 90% by FYE2030 from a FYE2021 base year. In addition we commit to reduce absolute Scope 3 GHG emissions 42% by FYE2030 from a FYE2021 base year.
Net Zero
Ground Control Ltd commits to reach net-zero GHG emissions across the value chain by FYE 2038 by reducing absolute scope 1, 2 and 3 emissions by 90% by FYE 2038 from a FYE 2021 base year.